tâche projet.status¶
A status report have to be written down for each model or WorkDefinition.
In order to do so a file status.md
is associated to each model,
or to a group of models. There is as well a global status.md
file
at the top level directory.
Rules¶
The following information should be present in the status file:
- what have been done,
- what is partially working and have to be continued / improved,
- what remains to be done.,
- a short synthesis.
Add other information when necessary (for instance bug found or issues encountered during the realisation of the task, a reference to an important hypothesis).
Be concise, yet as structured as possible.
If everything is ok, then a simple message could be enough. If some parts remain to be done an indicator such as “(about) 25% done” can be helpful. If the task has subtasks this could be “T3: Shape, Rectangle, Circle to be implemented”.
Be concise, yet as structured as possible.